What London Boroughs Charge to Approve a Solid Conservatory Roof
Six boroughs' published building control charges for the nearest category to a new solid roof, exactly as each council prints them.
Outside London, one council usually sets the building control fee for your roof. Here, it depends which side of a borough boundary your house happens to sit on.
Each of the 32 boroughs and the City of London runs its own building control service and writes its own charging scheme. The tables differ in more than price: they use different categories, some show VAT and some add it later, and almost none mentions a conservatory roof by name.
So we went to the source. For six boroughs we picked out the row, on the council's own charges page, that best matches swapping a glazed conservatory roof for a tiled one, and copied its figures exactly. If two rows could fairly apply, both appear.
The published charges, borough by borough
The figures below are as printed by each borough, including whether VAT is in or out. Read the category column before comparing two prices: the boroughs are not all charging for the same description of work.
| Borough | Nearest category published | Charges as printed | VAT | Charges from |
|---|---|---|---|---|
| Richmond upon ThamesRichmond building control | Table 1 AL01, all other works by estimated cost, band under £10,000 |
| Includes VAT at 20% (regularisation carries no VAT) | Base charges from 1 April 2026 |
| IslingtonIslington building control | Table 2, other works by estimated cost, £0 up to £3,000 |
| Includes VAT at 20%, except regularisation | Applications from 27 October 2025 |
| CamdenCamden building control | Fee Schedule 2 (residential), Code 11: reroofing of a single dwelling |
| 20% VAT shown in its own column | Scheme of Building Control Charges 2026 |
| Kingston upon ThamesKingston Building Control | Other domestic works, estimated cost not exceeding £20,000 |
| The page wording leaves it unclear whether VAT is added on top | Current schedule, year not stated on the page |
| BromleyBromley Building Control (run by the council) | Table B domestic, other alterations including structural, £5,000 to £25,000 |
| Before VAT; VAT is added at the standard rate | Year not stated (page updated 1 October 2026) |
| Tower HamletsTower Hamlets Building Control | Table C alterations, estimated cost £5,000 to £20,000 |
| Shown including VAT (plan charge is £618.91 before VAT) | Current schedule, year not stated on the page |
Richmond upon Thames: The schedule has no row for conservatories, thermal elements or small extensions.
Islington: The published bands shown stop at £5,000 of work; a tiled roof usually costs more than that.
Camden: Other refurbishment is priced by estimate under a separate schedule.
Kingston upon Thames: Re-covering a roof is listed separately at £310 per dwelling.
Bromley: No conservatory category in the table.
Tower Hamlets: The full plans inspection charge is not in the published table; work that is not listed is priced case by case.
What stands out
The most striking thing is how little the categories line up. Camden is the only borough here with a row that reads like a roof job at all, "reroofing of a single dwelling", and even that was written for houses rather than conservatories. Richmond, Islington and Kingston price by the estimated cost of the work. Bromley and Tower Hamlets do too, but in different bands.
The cost band matters more than you might think. A tiled roof in London typically costs well over £5,000, so the band you fall into can move the fee. Islington's published bands in this category stop at £5,000 of work, which is why its lower figures may not be the ones that apply to you.
The route matters too. In most boroughs here, full plans and a building notice cost about the same. Tower Hamlets is the exception, where the building notice charge for alterations of £5,000 to £20,000 is £1,856.60 including VAT, well above its £742.69 plan charge.
Two boroughs also say that work outside their tables is priced individually: Tower Hamlets for unlisted work, Camden for other refurbishment under a separate schedule. If your roof does not fit a category neatly, expect to be asked for an estimate of the cost of the work and given a figure.
Boroughs with no figure we could show
We would rather leave a borough out than print a number we are unsure of. For these three, the reason is below, along with the page we tried.
Wandsworth
The 2025 schedule could be read but its columns could not be matched to plan, inspection and building notice with confidence, and the 2026 file would not open.
The document we triedCroydon
Only a 2023 regularisation fee sheet turned up; the standard full plans and building notice charges were not found.
The document we triedBarnet
The charges guidance exists as a PDF but sits behind bot protection and could not be read.
The document we tried
What the borough's charge buys you
What you are paying for is an independent check, by the borough's building control officers, that the roof complies with the Building Regulations. On the full plans route, one slice of the fee is for examining drawings in advance and the rest is for visits. The building notice route skips the drawings, so the officer's checks all take place on site while the roof is built.
Once the inspector is satisfied, a completion certificate is issued. File it with the deeds: it proves the roof was signed off, and it tends to be asked for when the house is sold.
Regularisation is the third route, for work already done without approval. Several boroughs here price it at or above the building notice charge, and Richmond's, for example, carries no VAT.
Not sure whether your roof needs approval at all? You can read about the point where a conservatory loses its exemption in our London rules guide. For the cost of the roof itself, see the London cost page.
Who usually pays it
The fee sits on top of the roof price. Often the roofer lodges the application and folds the charge into the figure they give you; sometimes you are left to apply and pay the borough. Find out which applies to each quote, or you will not be comparing like with like.
Method, and where the numbers come from
Every figure comes from the borough's own charges page or PDF, read in November 2026. None of the six lists conservatory roofs as a category, which meant recording the category closest to the job: a reroofing row where one exists, otherwise the lowest relevant "other works" or alterations band by estimated cost, and a small extension row where it helps the comparison.
Numbers appear as each borough prints them, alongside its own category wording and VAT treatment. We have not added VAT, converted figures or rounded anything. Where a document could not be read, or its columns could not be matched to the right charges with confidence, we left the borough out of the table and said why.
Councils in England are moving to new charging schemes under building control charging regulations that took effect in November 2026, so some of these figures may be replaced soon. Always check the borough's current page before relying on a number. This study covers six boroughs, not all of London.
Sources: the council documents linked from each borough's name in the table and from the list of boroughs without a figure.
Get a quote that spells out the council fee
A good quote says whether the borough's charge is included. Tell us your postcode and a roofer who covers that part of London can be put forward.
We hunt out a single roof firm working in your corner of London and give you its name up front. Your details sit with us until you say go, and none of this costs you a penny. Read how introductions work.
Thanks. Your request is in.
Our next job is matching that postcode to one London roofer who works there. You will hear the name before anything else.
Your details stay put until you give that firm the nod. From there, they book a visit to see the frame and price your roof properly.