
Conservatory Roof Rules in London: Planning and Building Control
Planning and building control are separate tests, and London splits the second across 33 local teams. How they usually apply to a roof: a guide, not legal advice.
Ask most people what paperwork a new conservatory roof needs and they say planning. In practice planning is seldom the sticking point. Building control, the safety and energy check, is the one that catches people out.
Planning permission: seldom the hurdle
According to the Planning Portal, plenty of people swap a polycarbonate roof for a tiled one, and the majority of roof changes count as permitted development, within legal limits. Permitted development simply means categories of work the government has already approved, so no application is needed.
There is a caveat. Should the new roof change the look or structure of the conservatory in a big way, permission may come into play. Across London, four situations crop up often enough that you should rule them out early:
- Listed buildings. Work to a listed house, or to a conservatory attached to one, can need consent of a separate kind, so talk to the borough before anything is ordered.
- Conservation areas and Article 4 directions. An Article 4 direction strips out some permitted development rights within a mapped area. Conservation areas are everywhere in the capital; Bromley has 47 on its own list.
- Flats and maisonettes. These have none of the householder permitted development rights, so more work goes through an application.
- Strings attached to the original build. A conservatory put up under a permission with conditions, or a house whose permitted development rights were taken away, stays bound by those terms.
Recognise your home in that list? Then a quick question to your borough's planners before you order anything is cheap insurance.
Building regulations: the usual answer for tiles is yes
Plenty of conservatories have never seen an inspector, because the regulations exempt them. The relevant rule is Schedule 2 of the 2010 regulations, and the exemption only holds while all of these stay true:
- Ground floor, 30 m² or under. Measured as floor area.
- Glass that meets Part K, the part of the regulations dealing with safety glazing.
- A proper barrier to the house. Walls, doors or windows built to external standard keep it thermally apart.
- No radiators off the house system. The home's heating must not run into it.
Put new glass or new sheets on top and the room normally stays exempt. Put insulated tiles on top and it normally doesn't. A government circular from 2013 cautions that cutting the glazing to the walls or roof by a large amount can end the exemption, and LABC is blunt that once insulated tiles are on, the earlier exemption has gone.
From then on the roof is building work, so Approved Document L, on energy, applies to it. Officers will also want evidence that the frames, door supports and foundations underneath can bear the heavier roof, which is exactly what a thorough fitter looks at during the survey.
Building notice or full plans?
You choose one of two applications. What separates them is mostly timing: whether the checks happen on paper first or on site as you go.
- Full plans. You submit drawings, which are examined before work begins; the council has five weeks to decide, stretching to two months with your agreement. An approval notice follows, then a completion certificate once the roof is done. Slower to start, less risk later.
- Building notice. No drawings at the start. Once two clear days (48 hours) have passed since lodging, the roofer can start, and inspections happen on site. Faster, but anything an inspector rejects may need redoing.
Simple roofs on healthy frames often go through on a building notice. Where the frame needs beefing up or the design is out of the ordinary, full plans buys certainty before money is spent. The application itself can be made to the borough, though a registered building control approver may handle it just as well.
Your borough's building control team
London has no single building control body. Each of the 32 boroughs and the City of London runs its own service and sets its own charges, with different categories and different ways of showing VAT.
Below are the teams and fee pages for the boroughs we have looked at so far. If yours is not here, search for your borough's name with "building control charges".
- BarnetBarnet Building ControlCharges guidance (PDF, 2023)
- BromleyBromley Building Control, run by the councilBuilding control charges
- CamdenCamden Council building controlResidential charges schedule
- CroydonCroydon Building ControlRegularisation fees (PDF, 2023)
- IslingtonIslington Council building controlCharges and notes (PDF)
- Kingston upon ThamesKingston Building ControlDomestic charges
- Richmond upon ThamesRichmond building controlFees from April 2026 (PDF)
- Tower HamletsTower Hamlets Building ControlExtensions and alterations charges
- WandsworthWandsworth building controlCharges from April 2025 (PDF)
Want the actual figures side by side? Our London borough building control fee study sets out what six boroughs publish.
Who pays the building control fee?
Think of the borough charge as its own line, apart from the roof. Often the roofer lodges the paperwork and recovers the charge in the price; sometimes the homeowner applies and pays direct. Either is fine as long as you know which one you have, so pin every roofer down on it and see it written in.
You can see typical prices for the roof itself on our London cost page.
Outside England
Everything above is English law. Wales runs on similar lines, and one Welsh council's guide puts the threshold at three quarters of the roof staying translucent. In Scotland a solid roof on a conservatory generally means applying for a building warrant, and getting it, before any work begins.
This page is a general guide, not legal advice. Rules change, and your borough has the final word.
Rules questions we hear about London roofs
My conservatory never needed building regulations. Why does the new roof?
The exemption only lasts while the room is still, legally speaking, a conservatory. Swap most of the overhead glazing for an insulated solid roof and it stops qualifying, so the roof is judged like any other building work.
Can I swap a polycarbonate roof for glass without telling the council?
Normally yes, provided the room still ticks every exemption box once the glass is in: ground floor, 30 m² at most, shut off from the living space with outside-grade doors or windows, safe glazing and no house radiators. A straight swap seldom needs planning permission either, though listed homes and some conservation areas are the exceptions.
Our tiled roof was never signed off by building control. What now?
Boroughs offer regularisation for work done without approval. You apply, pay a fee and may have to expose parts of the roof for the inspector. Better dealt with well before a sale than during one.
Does my borough have to be the one that checks the work?
No. Either the borough's team or a registered building control approver can do it, and your fitter may already have a preference. Whichever you use, the completion certificate belongs with the deeds.
Where this comes from
- Planning Portal FAQ: a new roof for a conservatory
- Which buildings the regulations exempt: Schedule 2 (legislation.gov.uk)
- Conservatories and porches: the 2013 letter to councils (GOV.UK, PDF)
- LABC on conservatories that go solid
- How full plans approval works (Planning Portal)
- Bromley's conservation areas
- Welsh Government on conservatory building regs
- Torfaen's conservatory leaflet for householders (PDF)
Find a fitter who knows your borough
Someone who deals with your borough's building control week in, week out saves you a lot of reading. Start with your postcode.
We hunt out a single roof firm working in your corner of London and give you its name up front. Your details sit with us until you say go, and none of this costs you a penny. Read how introductions work.
Thanks. Your request is in.
Our next job is matching that postcode to one London roofer who works there. You will hear the name before anything else.
Your details stay put until you give that firm the nod. From there, they book a visit to see the frame and price your roof properly.